COST BENEFIT ANALYSIS – ECOCYCLE PROJECTS

 

CASE 1: 4 BEDROOM RESIDENCE ON 1/2 ACRE PREMISES, NAIROBI

 

COST OF ECOCYCLE RECYCLING SOLUTION (1.5m3 per day Sewage Recycling Capacity)

Description

Details

Cost (Kshs.)

Klaermax equipment 1.5m3 per day

Design & Supply, installation & One year warranty

599,000

Recycled water discharge pump

Procurement & Installation Costs

 55,000

TOTAL

654,000.00

SAVINGS ON SEWAGE & WATER EXPENSES DUE TO SEWAGE RECYCLING EQUIPMENT

Description

Details

Monthly Cost (Kshs.)

Annual Cost (Kshs.)

Lawn irrigation water

1.5m3per day to irrigate lawns @Kshs.150/m3

6,750.00

81,000.00

Frequent exhauster costs to empty septic tank

Two exhauster truck trips(assume a residential home in black cotton soil that exhausts every two months at Kshs 20K)

10,000.00

120,000.00

TOTAL

16,750.00

201,000.00

MONTHLY RUNNING COSTS ON ECOCYCLE SEWAGE RECYCLING SOLUTION

Description

Monthly Cost (Kshs.)

Electricity (0.08 Kwh rating, running for 8hrs, kwh cost at Kshs.33)

 

633.60

Chlorine  at Kshs.1500 per month

1,500.00

Annual Maintenance contract at Kshs.25,000 per year

2,083.33

 

TOTAL

4,216.93

MONTHLY BENEFITS/SAVINGS DUE TO ECOCYCLE RECYCLING SOLUTION

Description

Monthly

Savings (Kshs.)

Savings on buying irrigation water by reusing recycled water for the non-potable purposes e.g lawn irrigation

6,750.00

Savings on exhauster truck trips costs

10,000.00

TOTAL MONTHLY BENEFITS

16,750.00

 

Net Monthly Financial savings (benefits) Monthly savings – Monthly running costs=16,750.00-4,216.93= 12,533.07

 

PAYBACK PERIOD

In Months = Cost of Ecocycle Recycling system/ Monthly Net Savings (benefits) =599,000.00/12,533.07= 48 Months In Years; =48/12 = 4years.

 

CASE 2: 20 x THREE BEDROOM APARTMENTS, NAIROBI

 

COST OF ECOCYCLE RECYCLING SOLUTION (15m3 per day Sewage Recycling Capacity)

Description

Details

Cost (Kshs.)

Klaermax equipment 15m3 per day

Design & Supply, installation & One year warranty

4,353,667.13

Recycled water discharge pump

Procurement & Installation Costs

    65,000.00

TOTAL

4,418,667.13

SAVINGS ON SEWAGE & WATER EXPENSES DUE TO SEWAGE RECYCLING EQUIPMENT

Description

Details

Monthly Cost (Kshs.)

Annual Cost (Kshs.)

Lawn irrigation, open spaces cleaning, & car washing water.

10 cubic meters per day at a cost of Kshs. 150 per cubic meter

45,000.00

540,000.00

Frequent exhauster costs to empty septic tank

Two truck trips @ kshs.13,000.00 every two months

13,000.00

156,000.00

TOTAL

58,000.00

696,000.00

MONTHLY RUNNING COSTS ON ECOCYCLE SEWAGE RECYCLING SOLUTION

Description

Monthly Cost (Kshs.)

Running power costs (0.43 Kw rating running 10 hours per day) @kshs.33 per kwh

4,257.00

Chlorine disinfection costs (one Cartridge every month at a cost of Kshs.5,000)

5,000.00

TOTAL

9,257.00

MONTHLY BENEFITS/SAVINGS DUE TO ECOCYCLE RECYCLING SOLUTION

Description

Monthly Savings (Kshs.)

Cost Savings on irrigation, open space & Car cleaning water by reusing recycled water (18.75m3) daily for these non-potable purposes

45,000.00

Savings on exhauster truck trips costs  once every two months

13,000.00

TOTAL MONTHLY BENEFITS

58,000.00

Net Monthly Financial savings (benefits) Monthly savings – Monthly running costs= 58,000.00 -9,257.00= 48,743.00

 

PAYBACK PERIOD

In Months = Cost of Ecocycle Recycling system/ Monthly Net Savings (benefits) =4,353,667.13/48,743.00= 89 In Years; =89/12 = 7.4 years.