Ecocycle

The Ferry RoRo Project, Zanzibar

The Ferry RoRo Project, Zanzibar: Coastal Wastewater Treatment

On a coastal site, untreated discharge is not an option. The Ferry RoRo Project needed a system that could treat wastewater to a standard safe for the ocean.

The Challenge

The Ferry RoRo Project needed:

  • A system that could safely treat water for ocean discharge


The Ecocycle Solution

Operational since February 2026, the system delivers:

  • 18,750 litres/day of clean, odorless, reusable water — for irrigation and beyond
  • Ocean-safe discharge capability
  • Compact design — just 47.61m²


One Year of Impact

  • Zero exhauster trucks — eliminating logistical headaches and costs
  • Thriving green spaces — lush lawns nourished by recycled water
  • Uncompromised beaches — because tourism and sustainability must coexist


Future-proof your commercial development with Ecocycle — where every drop creates value.

0. The Ferry project site overview- Zanzibar (1) 1 2 3 4 5 6 7 8 8